@InProceedings{Mattiello-FranciscoSanAmbJogCos:2007:BrSoIn,
author = "Mattiello-Francisco, Maria de F{\'a}tima and Santiago, Valdivino
and Ambrosio, Ana Maria and Jogaib, Leise and Costa, Ricardo",
affiliation = "INPE, National Institute for Space Research, S{\~a}o Jos{\'e}
dos Campos, SP, Brazil and NPE, National Institute for Space
Research, S{\~a}o Jos{\'e} dos Campos, SP, Brazil and NPE,
National Institute for Space Research, S{\~a}o Jos{\'e} dos
Campos, SP, Brazil and {DBA Engenharia de Sistemas LTDA} and {DBA
Engenharia de Sistemas LTDA}",
title = "A Brazilian software industry experience in using ECSS for space
application software development",
booktitle = "Proceedings...",
year = "2007",
editor = "Loureiro, Geilson and Curran, Ricky",
pages = "163--170",
organization = "ISPE International Conference on Concurrent Engineering, 14. (CE
2007).",
publisher = "Springer",
address = "S{\~a}o Jos{\'e} dos Campos",
keywords = "software project standard, space mission, project lifecycle,
independent verification and validation.",
abstract = "This paper presents the tailoring of ECSS software product
assurance requirements aiming at the development of scientific
satellite payload embedded software by a Brazilian software
supplier. The software item, named SWPDC, developed by DBA
Engenharia de Sistemas LTDA within Software Factory context, is
part of an ongoing research project, named Quality of Space
Application Embedded Software - QSEE, developed by National
Institute for Space Research INPE, with FINEP financial support.
Among other aspects, QSEE project allowed to evaluate the
adherence of a Software Factory processes to INPEs embedded
software development process requirements. Although not familiar
with space domain, the high maturity level of such supplier,
CMMI-3 formally evaluated, facilitates the Software Factory to
comply with the requirements imposed by the custumer. Following
the software verification and validation processes recommended by
ECSS standards, an Independent Verification and Validation - IVV
approach was used by INPE in order to delegate the software
acceptance activities to a third party team. ECSS standard
tailored form contributions along the execution of the project and
the benefits provided to the supplier in terms of process
improvements are also presented herein.",
conference-location = "S{\~a}o Jos{\'e} dos Campos",
conference-year = "July 16-20",
copyholder = "SID/SCD",
isbn = "978-1-84628-975-0",
language = "en",
organisation = "Instituto Nacional de Pesquisas Espaciais (INPE)",
targetfile = "paper/paper.PDF",
type = "Software Engineering and Simulation",
urlaccessdate = "12 maio 2024"
}