Fechar

@InProceedings{GonçalvesCardAmbr:2002:PiPrEs,
               author = "Gon{\c{c}}alves, Luciana Seda Cardoso and Cardoso, Paulo Eduardo 
                         and Ambrosio, Ana Maria",
                title = "Pilot project for the establishment of a development process for 
                         future space systems at INPE",
                 year = "2002",
         organization = "International Symposium on Space Operational and Ground Data 
                         Systems, 7. (SpaceOps 2002); Bringing Space Operations into the 
                         21st Century.",
             keywords = "ENGENHARIA E TECNOLOGIA ESPACIAL, ground segment, ECSS standard, 
                         European Cooperation for Space Standardization, development 
                         process, FBM, French-Brazilian Micro-satellite.",
             abstract = "This work presents a customization of the European Cooperation for 
                         Space Standardization (ECSS)standards for defining a development 
                         process for the ground segment of the FBM project. The FBM project 
                         consists of a scientific/technological space mission developed in 
                         cooperation between Brazil and France. In this project, the 
                         development of the ground control system and the in-flight 
                         satellite operation are under INPE responsibility. For the 
                         in-house developed ground systems, a process that establishes 
                         project phases, milestones, activities, input and the output 
                         ocuments/products to be generated at each phase, was defined, 
                         taking into account the existing resources and background at INPE. 
                         This paper focuses on the aspects of requirements management, 
                         configuration management, verification and validation . Moreover, 
                         it points out the COTS tools adopted for assisting in the product 
                         quality assurance activities. The process, defined in the context 
                         of the FBM ground segment, is being considered as a pilot project 
                         . It is expected that, as a consequence of its good results, in 
                         the long term, it will be adopted in all future missions.",
  conference-location = "Houston, USA",
      conference-year = "9-12 Out. 2002",
                label = "11346",
           targetfile = "9578.pdf",
        urlaccessdate = "11 maio 2024"
}


Fechar