1. Identificação | |
Tipo de Referência | Artigo em Evento (Conference Proceedings) |
Site | plutao.sid.inpe.br |
Código do Detentor | isadg {BR SPINPE} ibi 8JMKD3MGPCW/3DT298S |
Identificador | 8JMKD3MGP3W/3KN33U9 |
Repositório | sid.inpe.br/plutao/2015/12.04.13.50.49 |
Última Atualização | 2015:12.11.12.20.28 (UTC) administrator |
Repositório de Metadados | sid.inpe.br/plutao/2015/12.04.13.50.50 |
Última Atualização dos Metadados | 2022:04.09.17.55.42 (UTC) administrator |
DOI | 10.3233/978-1-61499-544-9-71 |
Rótulo | lattes: 1555060330133009 3 GarbiLourChag:2015:KiMoPr |
Chave de Citação | GarbiLourChag:2015:KiMoPr |
Título | Kinematic model of project scheduling with resource constrained under uncertainties |
Formato | Papel |
Ano | 2015 |
Data de Acesso | 20 abr. 2024 |
Tipo Secundário | PRE CI |
Número de Arquivos | 1 |
Tamanho | 471 KiB |
|
2. Contextualização | |
Autor | 1 Garbi, Giuliani Paulineli 2 Loureiro, Geilson 3 Chagas Junior, Milton de Freitas |
Identificador de Curriculo | 1 2 8JMKD3MGP5W/3C9JH57 |
Grupo | 1 DIR-DIR-INPE-MCTI-GOV-BR 2 LIT-LIT-INPE-MCTI-GOV-BR 3 DIR-DIR-INPE-MCTI-GOV-BR |
Afiliação | 1 Instituto Nacional de Pesquisas Espaciais (INPE) 2 Instituto Nacional de Pesquisas Espaciais (INPE) 3 Instituto Nacional de Pesquisas Espaciais (INPE) |
Endereço de e-Mail do Autor | 1 giuliani.garbi@inpe.br 2 geilson.loureiro@inpe.br 3 milton.chagas@inpe.br |
Nome do Evento | ISPE International Conference on Concurrent Engineering, 22 |
Localização do Evento | Delft |
Título do Livro | Proceedings |
Tipo Terciário | Paper |
Histórico (UTC) | 2015-12-04 13:50:50 :: lattes -> administrator :: 2022-04-09 17:55:42 :: administrator -> simone :: 2015 |
|
3. Conteúdo e estrutura | |
É a matriz ou uma cópia? | é a matriz |
Estágio do Conteúdo | concluido |
Transferível | 1 |
Tipo do Conteúdo | External Contribution |
Palavras-Chave | Gestão de Projetos Gestão de risco Toamda de decisão Pesquisa e Desenvolvimento |
Resumo | Projects represent the principal means of materialization of products. The inherent complexity of product projects is treated through the techniques and approaches project management. Throughout products life cycle the techniques and approaches project management are mainly involved in the planning, programming and control of project activities conducted in context of resource constrained under uncertainties. In addition of scenarios the complexity of the projects, there are some classes of products, typical of industries of the defense, aerospace, telecommunication, software, and biomedicine, which are problematic for current methods of resource constrained project planning and scheduling under uncertainty. The existing methods fail because they suffer from one or more of the following limitations: focused mainly on the basic RCPSP (Resource Constrained Project Scheduling Problem) model; dealing with only one source of uncertainty, mostly in duration of activities; and do not model uncertainties. This paper presents the kinematic model of projects scheduling which considering the inherent restrictions in nature of the projects: precedence among project activities; uncertainties of the duration of project activities; and uncertainties in availability of resources for execution of project activities. The kinematic model of projects scheduling provides a graph and mathematical model with the advantages: estimation of the project duration and resources due to uncertainties; estimation of the uncertainties due to project duration and resources; improvement of the outcomes of planning and scheduling of project activities; and assists the dynamics of projects providing information for collaboration policy of the durations and resources between project activities and between different projects. This article describes the Resource Constrained Project Scheduling Problem under uncertainties, discuss previous work on planning under uncertainty, and presentation of the kinematic model of projects scheduling with resource constrained under uncertainties along with a small example of implementation. |
Área | ETES |
Arranjo 1 | urlib.net > BDMCI > Fonds > Produção anterior à 2021 > COLIT > Kinematic model of... |
Arranjo 2 | urlib.net > BDMCI > Fonds > Produção anterior à 2021 > DIR > Kinematic model of... |
Conteúdo da Pasta doc | acessar |
Conteúdo da Pasta source | não têm arquivos |
Conteúdo da Pasta agreement | não têm arquivos |
|
4. Condições de acesso e uso | |
URL dos dados | http://urlib.net/ibi/8JMKD3MGP3W/3KN33U9 |
URL dos dados zipados | http://urlib.net/zip/8JMKD3MGP3W/3KN33U9 |
Idioma | en |
Arquivo Alvo | 1_garbi2.pdf |
Grupo de Usuários | lattes simone |
Grupo de Leitores | administrator simone |
Visibilidade | shown |
Permissão de Leitura | allow from all |
Permissão de Atualização | não transferida |
|
5. Fontes relacionadas | |
Repositório Espelho | urlib.net/www/2011/03.29.20.55 |
Unidades Imediatamente Superiores | 8JMKD3MGPCW/444BQ9E 8JMKD3MGPCW/449PGL8 |
URL (dados não confiáveis) | http://ebooks.iospress.nl/volume/transdisciplinary-lifecycle-analysis-of-systems-proceedings-of-the-22nd-ispe-inc-international-conference-on-concurrent-engineering-july-20-23-2015 |
Acervo Hospedeiro | dpi.inpe.br/plutao@80/2008/08.19.15.01 |
|
6. Notas | |
Notas | Setores de Atividade: Pesquisa e desenvolvimento científico. |
Campos Vazios | archivingpolicy archivist callnumber copyholder copyright creatorhistory date descriptionlevel dissemination e-mailaddress edition editor isbn issn lineage mark nextedition numberofvolumes orcid organization pages parameterlist parentrepositories previousedition previouslowerunit progress project publisher publisheraddress rightsholder schedulinginformation secondarydate secondarykey secondarymark serieseditor session shorttitle sponsor subject tertiarymark type versiontype volume |
|
7. Controle da descrição | |
e-Mail (login) | simone |
atualizar | |
|