1. Identity statement | |
Reference Type | Conference Paper (Conference Proceedings) |
Site | mtc-m16b.sid.inpe.br |
Holder Code | isadg {BR SPINPE} ibi 8JMKD3MGPCW/3DT298S |
Repository | dpi.inpe.br/ce@80/2007/01.20.22.42 (restricted access) |
Last Update | 2007:05.18.20.21.48 (UTC) administrator |
Metadata Repository | dpi.inpe.br/ce@80/2007/01.20.22.42.31 |
Metadata Last Update | 2018:06.05.03.33.46 (UTC) administrator |
Citation Key | ZattarFerrGranSous:2007:InMaPr |
Title | Integrating Manufacturing Process Planning with Scheduling via Operation-Based Time-Extended Negotiation Protocols |
Format | Print; CD-ROM; On-line. |
Year | 2007 |
Access Date | 2024, Apr. 27 |
Secondary Type | CI |
Number of Files | 4 |
Size | 5784 KiB |
|
2. Context | |
Author | 1 Zattar, Izabel Cristina 2 Ferreira, João Carlos Espindola 3 Granado, João Gabriel G. 4 Sousa, Carlos H. B. de |
Affiliation | 1 UFSC - Depto de Engenharia Mecanica 2 UFSC - Depto de Engenharia Mecanica 3 UFSC - Depto de Engenharia Mecanica 4 UFSC - Depto de Engenharia Mecanica |
Author e-Mail Address | 1 izabel.zattar@gmail.com 2 jcarlos@emc.ufsc.br 3 gabrielgranado@gmail.com 4 carlos.sousa@gmail.com |
Editor | Loureiro, Geilson Curran, Ricky |
e-Mail Address | izabel.zattar@gmail.com |
Conference Name | ISPE International Conference on Concurrent Engineering, 14 (CE 2007). |
Conference Location | São José dos Campos |
Date | 2007, July 16-20 |
Publisher | Instituto Nacional de Pesquisas Espaciais (INPE) |
Publisher City | São José dos Campos |
Pages | 319-326 |
Book Title | Proceedings |
Organization | Instituto Nacional de Pesquisas Espaciais (INPE) |
History (UTC) | 2007-03-08 14:01:56 :: izabel.zattar@gmail.com -> ce2007 :: 2007-03-29 12:37:05 :: ce2007 -> izabel.zattar@gmail.com :: 2007-04-06 13:12:54 :: izabel.zattar@gmail.com -> ce2007 :: 2007-04-12 21:44:12 :: ce2007 -> administrator :: 2007-05-18 15:21:43 :: administrator -> ce2007 :: 2007-05-21 19:34:34 :: ce2007 -> administrator :: 2007-12-04 15:45:57 :: administrator -> izabel.zattar@gmail.com :: 2007-12-04 19:49:57 :: izabel.zattar@gmail.com -> administrator :: 2018-06-05 03:33:46 :: administrator -> marciana :: 2007 |
|
3. Content and structure | |
Is the master or a copy? | is the master |
Content Stage | completed |
Transferable | 1 |
Keywords | Machining Features Scheduling Negotiation by grouping Multiagent systems |
Abstract | Traditionally the process planning and scheduling functions are executed in a sequential way, and alternative resources are not usually considered. In this paper it is proposed the on-line adaptation of the process plan with alternatives, through the application of a feature-based time-extended negotiation protocol for decision-making about real-time routing of job orders of parts composed of machining features in a job-shop environment. The protocol is modified from the contract net protocol to cater for the multiple-task and many-to-many negotiations. The grouping of the machining features enables gains in the setup times, and these earnings are associated with the lower number of setups usually caused by unnecessary machines changes. The proposed architecture comprises the following types of agents: part, resource, server, failure, order, and synchronizer agents. For each part, all feasible routings are considered as alternative process plans provided the different manufacturing times are in each machine are taken into account. The time-extended negotiation period, which allows the visualization of all of the times involved in the manufacture of each part, including those times that are not considered in systems of this nature, such as the negotiation times among agents. Through the inclusion of a failure agent it is possible to verify the robustness of the system and to measure the impact caused by production disturbances, such as machine breakdowns. A dynamic Gantt chart is generated starting with each of the simulations, having as input the changes of status of the system, such as the beginning and end of processes, as well as production disturbances. The proposed system is already being used, and extensive experiments have been conducted and the performance measures, including routings, makespan and flowtime, are compared with those obtained by the following approaches found in the literature: traditional hierarchical approach, an existing cooperative co-evolutionary algorithm, and the search technique base on the co-evolutionary algorithm. |
Area | ETES |
Type | Manufacturing processes and environmental requirements for sustainability |
doc Directory Content | access |
source Directory Content | Article_CE2007_jc1.doc | 08/03/2007 10:50 | 322.5 KiB | Paper.pdf | 08/03/2007 10:51 | 94.6 KiB | |
agreement Directory Content | there are no files |
|
4. Conditions of access and use | |
Language | en |
Target File | paper.pdf.pdf |
User Group | administrator izabel.zattar@gmail.com administrator |
Visibility | shown |
Read Permission | deny from all and allow from 150.163 |
|
5. Allied materials | |
Host Collection | lcp.inpe.br/ignes/2004/02.12.18.39 cptec.inpe.br/walmeida/2003/04.25.17.12 |
|
6. Notes | |
Mark | 1 |
Empty Fields | archivingpolicy archivist callnumber contenttype copyholder copyright creatorhistory descriptionlevel dissemination documentstage doi edition group identifier isbn issn label lineage mirrorrepository nextedition nexthigherunit notes numberofvolumes orcid parameterlist parentrepositories previousedition previouslowerunit progress project readergroup resumeid rightsholder schedulinginformation secondarydate secondarykey secondarymark serieseditor shorttitle sponsor tertiarymark tertiarytype url versiontype volume |
|
7. Description control | |
e-Mail (login) | marciana |
update | |
|